1. | Remove the engine cover. |
2. | Remove the cowl cover and under-cowl panel. |
3. | Remove the injector fuel return hose (A).
|
4. | Disconnect the injector 2P connector (B), and raise the harness holder. |
5. | Place a wrench (A) on the joint (B). NOTE: Do not move the joint.
|
6. | Place a wrench (C) on the nut (D), then remove the high pressure pipes (E). |
7. | Remove the nozzle arm (A), and the injector (B). NOTE:
|
1. | Position the injector angle, tighten the nut (A) by the hand with a new high pressure pipe.
|
2. | Install the nozzle arm (B), and the injector with a new gasket (C). |
3. | Tighten the nozzle arm bolt (D), and tighten the bolt an 90 °. |
4. | Tighten the nuts of injector side. |
5. | Tighten the nuts of fuel rail side (E). |
6. | Install the parts in the reverse order of removal. NOTE:
|
7. | Bleed the fuel system. |
8. | Do the Injector Quantity Adjustment. |